Centrifugal Pump Rebuild & Efficiency Restoration
Cold-rebuilding an eroded pump casing and lining it to restore clearances, no new casting required.
What was failing
Cooling-water and process pumps move abrasive, corrosive fluid that slowly eats the casing, volute, and wear rings. As that metal is lost, internal running clearances open up and the hydraulic surface roughens. The pump moves less fluid for the same input, and the plant feels it as lost efficiency and a unit pulled from the rotating spares pool. The usual answer is a new casting, which is costly and often on a long lead time.

How AAS approaches it
We take the pump into the shop and assess where the metal has been lost. We blast the casing, volute, and wear ring areas back to clean substrate, then rebuild the worn metal cold with Belzona 1000 Series composites. We reform the internal profile to the original clearances and apply an erosion-resistant lining over the flow path. The result is a smooth hydraulic surface and tight clearances, ready to go back into service.
Assess and measure
We inspect the casing, volute, and wear rings and map where erosion and corrosion have opened the internal clearances.
Surface preparation
We grit-blast the worn areas back to a clean, profiled substrate so the repair materials bond properly.
Cold metal rebuild
We rebuild the lost metal with Belzona 1000 Series composites, working cold so the casing sees no heat distortion.
Reform and line
We reform the internal profile to the original running clearances and apply an erosion-resistant lining across the flow path.
Return to spares pool
We finish the hydraulic surfaces smooth and return the rebuilt pump to the plant's rotating spares pool.
The result
From the job
Repair and protection work of this kind, performed by AAS crews across Louisiana.
Capabilities used here
Where this work happens
Other projects

Storage Tank Floor Reclamation
Corroded aboveground tank floor rebuilt and lined back to immersion service without cutting out plate.
View project
Live Pipe Leak Seal & Composite Wrap
Live leak sealed and a degraded process line reinforced with an engineered composite wrap, no welding and often no shutdown.
View project
Wastewater Clarifier & Concrete Structure Relining
Spalled, rebar-exposed concrete clarifier rebuilt and relined for continued immersion service.
View project
Heat Exchanger Water Box Protection
Blasting, metal rebuild, and a barrier coating restore a corroded exchanger water box and tube sheet in cooling-water service.
View project
Chute & Hopper Erosion Lining
Worn chutes, hoppers, and slurry pumps rebuilt and lined with impact- or abrasion-resistant systems matched to the wear.
View projectHave equipment that needs to stay in service?