Wet Scrubber and Ductwork Lining
Corroding wet scrubber and ductwork blasted, rebuilt, and lined under one chemical-resistant film so the condensate runs over the lining instead of into the steel.
What was failing
A wet scrubber and its inlet and outlet ductwork corrode where acidic condensate forms on the gas side and runs down the walls. The condensate collects at the seams and the floor, and that is where the attack concentrates, thinning the plate and starting pinholes at the welds. Once a pinhole opens, the scrubber leaks and the duct loses the wall it needs to carry the gas stream safely. Left untreated, the condensate keeps finding the lowest points, the pitting spreads across the plate, and the unit comes off line for repairs that the plant did not plan for.

How AAS approaches it
We start by blasting the scrubber internals and the duct walls back to clean steel so the repair and the lining bond to bare metal. We rebuild the thinned seams and the pitted plate with a cold-applied composite to bring the surface back to profile, and we seal the floor where the condensate had been collecting. Then we line the scrubber and duct internals with a chemical-resistant barrier keyed to the gas and the condensate, so the walls, the seams, and the floor all sit under one continuous film. With the lining in place the condensate runs over the barrier and off the unit instead of soaking into the steel.
Assess and map
We inspect the scrubber and the inlet and outlet ductwork to map the pitting, the thinned seams, and the floor area where the condensate collects, and we confirm the gas and condensate so the lining is keyed correctly.
Blast to clean steel
We grit-blast the scrubber internals and the duct walls to a clean, profiled surface so both the composite and the lining bond to bare steel.
Rebuild seams and pitting
We rebuild the thinned weld seams and the pitted plate with a cold-applied composite, with no hot work, bringing the surface back to profile.
Seal the floor and line internals
We seal the floor where the condensate had pooled and apply a chemical-resistant lining across the scrubber and duct internals as one continuous barrier.
Inspect and return to service
We check the lining for continuity over the walls, seams, and floor, then hand the scrubber and ductwork back ready for the gas stream.
The result
From the job
Repair and protection work of this kind, performed by AAS crews across Louisiana.
Capabilities used here
Where this work happens
Other projects

Storage Tank Floor Reclamation
Corroded aboveground tank floor rebuilt and lined back to immersion service without cutting out plate.
View project
Centrifugal Pump Rebuild & Efficiency Restoration
Cold-rebuilding an eroded pump casing and lining it to restore clearances, no new casting required.
View project
Live Pipe Leak Seal & Composite Wrap
Live leak sealed and a degraded process line reinforced with an engineered composite wrap, no welding and often no shutdown.
View project
Wastewater Clarifier & Concrete Structure Relining
Spalled, rebar-exposed concrete clarifier rebuilt and relined for continued immersion service.
View project
Heat Exchanger Water Box Protection
Blasting, metal rebuild, and a barrier coating restore a corroded exchanger water box and tube sheet in cooling-water service.
View projectHave equipment that needs to stay in service?
Tell us what is failing. We respond quickly, and we offer 24-hour on-call service.